Landscape Design & Hedge Installation

Landscape Design & Hedge Installation

Plan a privacy hedge, refresh a planting area or discuss a larger landscape project. Share your priorities with Annethe, then review a written scope and price before booking.

Start my project request   Call Annethe: (818) 378-8915

A useful brief, without the guesswork

  1. Your contact and location: name, email, phone, city and ZIP code.
  2. Your goal: choose hedge installation or landscape design. Tell us whether you want more privacy, a new planting layout or a larger garden refresh.
  3. Your space: approximate hedge length, planting width and desired height. Mention gates, slopes, stairs, existing plants and irrigation.
  4. Your timing and budget: share a preferred timeframe and an approximate budget if known. In Comment, describe the result that matters most.

Not sure which plants or sizes you need? Say so. Compare our hedge range and plan your quantity, or let us review your site first.

Send photos that help us quote

Email a wide view of the area, a view along the proposed hedge and any difficult access points to hedgesupply@gmail.com. Use the same name and project city as your form. Include measurements where you have them.

From request to a written plan

  1. Review: we assess your brief, location and availability.
  2. Clarify: we may request further photos or arrange an assessment. Any assessment charge must be agreed in advance.
  3. Quote: your proposal identifies work, materials, exclusions, charges and proposed scheduling.
  4. Approve: work is booked only after the scope, price and schedule are agreed.
What is included in the plant price?

Listed prices are per plant. Design, installation, removal, hauling, irrigation, amendments and difficult-access work are separate and included only when specified in your written quote. Plant delivery typically takes 2–14 business days; installation has a separately agreed schedule.

Which areas can request a project?

Ventura, Los Angeles, Orange, San Diego and Riverside counties, including Palm Springs. Availability and access are confirmed for each address. An inquiry does not guarantee a service date.

Can you help care for the garden afterward?

Use our maintenance request page to describe ongoing care or a one-time visit. Services and frequency are agreed separately.

Tell us about your project

Complete the form below. Name, email, phone, city, ZIP code and Comment are required. Look for the on-screen confirmation, then check your email and spam folder for our reply. If the form fails, email your brief to hedgesupply@gmail.com. An inquiry does not create a booking or charge.

Landscape design with Annethe

A garden that feels like you.

Bring your photos, your ideas and the way you want to live outside. Annethe of Succulents Forever helps shape the planting, layout and details of a more personal outdoor space.

Start with a privacy hedge, a garden refresh or a wider landscape brief. We review your site, priorities and budget before preparing a written scope. Design, installation and maintenance are quoted separately.

Project inquiries across Ventura, Los Angeles, Orange, San Diego and Riverside counties, including Palm Springs. Availability and scheduling are confirmed for each site.

Discuss your project Call Annethe: +1 (818) 378-8915
Geometric concrete pathway with green joints from Annethe's landscape portfolio
Project image from Annethe’s landscape portfolio.
Two views of a poolside garden with planting beds from Annethe's portfolio

Room to live outside

Poolside planting and outdoor-space details from the landscape portfolio.

Annotated landscape planting plan from Annethe's design portfolio

Thought through on paper

A planting-plan example. Your layout is prepared for your own site, priorities and agreed scope.

Continuing education

Recycled-water site-supervisor training

Annethe completed the Recycled Water Users Site Supervisor Training Program on October 5, 2026. The certificate was issued by the County Sanitation Districts of Los Angeles County and records 3.0 contact hours.

This is a training completion certificate. Project scope, required trade qualifications and service availability are reviewed separately.

View training certificate (PDF)
Annethe training completion certificate, October 5, 2026, Recycled Water Users Site Supervisor Training Program

Tell us about your project

Include your city, ZIP code and measurements. Email photos to hedgesupply@gmail.com. Inquiries do not book a service or authorize a charge.

Email site photos with your name and project city to hedgesupply@gmail.com. Privacy policy